Expected duration: 1 day or less I need a boq and cost estimate for a structural project, just the concrete foundation broken down In an excel sheet and also like the form attached
1. Excavation of footing F1 (5-qty x 2), F2 (1-qty x 2) and Elevator shaft recess footing (1- qty x 2) – Ref. S100 2. Excavation of exterior and interior grade beams – Ref. S100 details 1,2,3,4,5,6,7 & 8/S300 3. Installation of vapor barriers for footings, grade beams and slab on grade concrete 4. Footing F1 (5-qty x 2), F2 (1-qty x 2) and Elevator shaft recess footing (1- qty x 2) – Ref. S100 5. Exterior and interior grade beams – Ref. foundation size schedule for conventional grade beams and footings on S100 and details 1,2,3,4,5,6,7 & 8/S300 6. Structural Steel anchor bolts/ embed plate per 9/S300, baseplate per 10/S300 and A211 – Floor Plan Building B&C 7. Slab of grade reinforcement with #3@12” O.C. 8. Pour 4,000psi concrete footings, beams and slab on grade.
Required pull database clients website electronic internal Category: Data Analysis, Data Collection, Data Entry, Data Extraction, Data Management, Data Mining, Data Processing, Database Management, Excel, Web Scraping Budget: $30 - $250 USD
17-Sep-2025 15:57 GMT
Generative AI Assignment Category: AI Chatbot, AI Chatbot Development, AI Development, C, Programming, Java, Natural Language Processing, OpenAI, PDF, PHP, Software Architecture Budget: ₹600 - ₹1500 INR
17-Sep-2025 15:57 GMT
Odoo v17 RFID Integration Category: Android, API Development, Asset Management, Bluetooth Low Energy (BLE), Inventory Management, Mobile App Development, Odoo, Python, REST API, Software Documentation Budget: $250 - $750 USD